U.S. Air Force Civil Engineer Center
Join the Air Force
Home
News
News
Video
Multimedia
Featured Topics
70th Anniversary
PFOS & PFOA
Publications
CE Magazine
Energy Express
Archives
Enterprise Procurement Clearinghouse Reports
Administrative Record
About Us
Mission
Biographies
Fact Sheets
Organizational Structure
Contact Us
What We Do
BRAC
Energy
Environment
Real Estate Development
Facility Engineering
Housing
Installations
Operations
Readiness
Business
Search U.S. Air Force Civil Engineer Center:
Home
>
News
>
Photos
Photos
Keyword:
Category:
All Images
BRAC
Construction
Design Awards
Energy
Environment
EOD
Fire fighting
Housing
Leadership
Operations
Other
People
Readiness
RED HORSE
Tag:
Sort By:
Upload Date
Photo Date
Title
OO-ALC to start new era in energy management
(Left to right) Brandon Ernsberger, Tyler Hatch and Robert Clements, 309th Maintenance Support Squadron lift and compressor personnel, remove a 200-horsepower electric compressor motor from a crane in building 843 on Oct. 23, 2017 at Hill Air Force Base, Utah. The motor was removed from building 265, which is part of the compressed air loop no. 2 system that runs through 14 buildings and is slated for energy improvement to help the Ogden Air Logistics Complex reach ISO-50001 certification. (U.S. Air Force photo by Alex R. Lloyd)
Related Imagery
Mr. Alex R. Lloyd (GS-12)
171023-F-EI321-0043.JPG
DOWNLOAD PHOTO
(0.34 MB)
Tags
Ogden Air Logistics Complex
,
oo-alc
,
Ogden ALC
,
ISO-50001
,
ENERGY
Back to Main Gallery
Site Map
IG
AF Sites
AF Executive Fleet
Questions
FOIA
Contact Us
SAPR
USA.gov
No FEAR Act
RSS
Accessibility
EEO
Link Disclaimer
Strategic APR
Suicide Prevention