News Search

  • AFCEC continues runway replacement at Offutt AFB

    JOINT BASE SAN ANTONIO-LACKLAND, Texas – After nearly a year of construction, the Air Force Civil Engineer Center-led project to replace aging runway infrastructure at Offutt Air Force Base, Nebraska, is making steady progress and on track to have aircraft flying out of the installation by the fall

  • AFCEC spearheads Little Rock AFB runway replacement

    The Air Force Civil Engineer Center is leading a $180 million project to replace the 64-year-old runway at Little Rock Air Force Base, Arkansas. AFCEC’s Facility Engineering Directorate is teaming with the Air Force Installation and Mission Support Center’s Detachment 9, 772nd Enterprise Sourcing

  • APE ensures mission-ready airfields

    It takes a lot of pavement to launch an Air Force -- 2.2 billion square feet -- and in 2019, a Tyndall-based team of airfield engineers set a blistering pace to ensure that pavement was able to support aircraft worldwide in flying more than 1.2 million hours.

  • Clearing the zone to save birds

    The 633rd Civil Engineer Squadron began construction to install new drainage systems to more efficiently rid the airfield of water at Joint Base Langley-Eustis, Virginia, March 2019.

  • 435th CTS Hosts RADR training course

    U.S. Airmen assigned to the 435th CTS training flight, trained the first group of Civil Engineer Airmen on the new Rapid Airfield Damage Repair training course at Ramstein Air Base, Germany.