1 00:00:00,000 --> 00:00:00,000 2 00:00:07,900 --> 00:00:10,240 Contract award was in May of 3 00:00:10,240 --> 00:00:14,040 2019 , contractor took the side around 4 00:00:14,040 --> 00:00:17,600 october of 2019 . Um , the expected 5 00:00:17,710 --> 00:00:20,110 contract completion date right now is 6 00:00:20,110 --> 00:00:23,230 March of 2026 . Over the years it's 7 00:00:23,240 --> 00:00:25,580 twisted slightly . There's been some 8 00:00:25,580 --> 00:00:27,858 unique challenges the way it was built . 9 00:00:27,858 --> 00:00:30,240 So , um , if you were to pull apart the 10 00:00:30,240 --> 00:00:32,840 tent and look inside , you'd see a 11 00:00:32,850 --> 00:00:34,961 pretty much a raw structure right now 12 00:00:34,961 --> 00:00:37,390 And you'd see how difficult it is in 13 00:00:37,450 --> 00:00:40,400 just pulling them off and putting brand 14 00:00:40,400 --> 00:00:43,040 new matching panels back on . It's made 15 00:00:43,040 --> 00:00:45,220 up of a steel structure with aluminum 16 00:00:45,220 --> 00:00:47,331 on top of it . So right away , it's , 17 00:00:47,660 --> 00:00:50,410 it consists of this unique shape . 18 00:00:50,420 --> 00:00:53,700 We're in 7200 ft elevation , so the 19 00:00:53,700 --> 00:00:55,867 aluminum and the steel will contract . 20 00:00:55,867 --> 00:00:58,100 There's glass , the project is always 21 00:00:58,100 --> 00:01:01,790 leaked . So this is an effort really to 22 00:01:01,790 --> 00:01:04,090 stop that leak . It's a long time 23 00:01:04,090 --> 00:01:06,090 coming that , that it's really been 24 00:01:06,090 --> 00:01:09,240 needed to do . And I'm , I think , I 25 00:01:09,240 --> 00:01:11,184 think we're gonna have a great end 26 00:01:11,184 --> 00:01:11,250 product